Pre-decision reuse scoring

Know what your building components are worth before the project freezes

REON scores every building component so owners decide on reuse while scope and budget can still move.

I want to assessa buildinga portfolioorI am a reuse expert
RVI score
CHF 41krecoverable value
3.2 kg/m²CO₂ avoidable
11%reuse share of mass
88%
Double-leaf window, PVC24 units · route: reuse
Max to high
71%
Single-leaf door, timber18 units · route: adapt, then reuse
Normal
64%
Washbasin, ceramic32 units · route: adapt, then reuse
Normal
−18%
Facing brick120 m² · route: recycle
Below zero
n/a
Steel beam, IPE 300Not enough data for a score
No score
Funded by BRIDGE, Swiss National Science Foundation and Innosuisse Research: EPFL Partners QuanthomeBIM Facility
The gap

Reuse is decided before anyone has the numbers

Decision open
REON assesses here
Project freezeScope, cost, schedule locked
DemolitionMost material is crushed. Value gone before it was assessed.
New projectNew components bought
Scope, cost, schedule locked
Most material is crushed. Value gone before it was assessed.
New components bought
TodayWith REON
Not on the checklist→Built in from the start
Nobody asks for the reuse value of components.An early pre-diagnosis, based on data you already hold.
Raised too late→Before the freeze
Scope, cost and schedule are already validated.The value is quantified before decisions lock.
No way to know where to look→Experts start where value is
Which building, which components? Without a first score, the answer is a guess.REON ranks components first. Reuse experts then go deep on the ones that matter.
How it works

From a component list to a ranked decision

01UploadFill the template
Fill the Excel template: one row per component with type, material, dimensions, condition, age and quantity.
02ScoreFour sub-scores
REON calculates economic, environmental, technical and demand sub-scores for each component.
03RankBands and confidence
Components land in a band with a confidence flag. Below zero they are still ranked, so you see which are closest to worth it. No score where data does not support one.
04ExportPDF and CSV
A PDF report and a CSV with the signed RVI, reuse potential, CHF value, CO₂ avoided and the portfolio roll-up.
The result

Every component ranked, valued and explained

A sample building. Open any row to see the reasoning behind its score. Switch to 600 components to see how a large building is shown.

Sample building

Want this with your own components?

Get a demo Open the App
The scale

A score that goes below zero

REON shows how far a component is from worth reusing, on economic, environmental, technical and market grounds.

Facing brick −18%
Door 71%
Window 88%
20
40
60
80
100
−1000+100
Max to high · 80 to 100 Normal · 60 to 80 Medium · 40 to 60 Low · 20 to 40 Extreme low · 0 to 20 Below zero · costs and constraints outweigh reuse, darker is further away
Rank what you will not reuse
A brick at −18% is closer to worth it than a slab at −70%. You see the order, not just a red flag.
Compare better scenarios
Change the route or the condition and watch the score move, from negative toward positive.
Zero is the line
Above it, the benefits of reuse outweigh the costs and it counts in your CHF and CO₂ totals. Below it, the costs and constraints win.
Better route:ReuseAdapt, then reuseRecycleDisposeThe owner decides. The score shows what each option is worth.
Data layer

The market data behind every RVI score

52,000+listings and transactions analysed
9countries in the dataset
90%+match with expert assessment on validated component types
Built for what you must report

Three numbers your reports already ask for

CHFTotal recoverableValue of components worth reusingCircular Building Charta
CO₂-eqAvoidable, kg/m²Net benefit after disposal, preparation and transportEmbodied-carbon limits
Reuse %Share of massShare of building mass that can stay in useOR 964a reporting
Why REON

A traceable score, built on real market data

A carbon tool says140 kg CO₂ saved if reused.

Nothing about price, demand or whether anyone will take it.

A marketplace saysListed at CHF 320.

Nothing about what reuse saves, or whether it will sell at that price.

REON saysRVI 78%. Route: reuse.

CHF 190 recoverable, 140 kg CO₂ avoided, about 33 days to sell. One score, one decision, before the project freezes.

Sample, illustrative figures.

Real market data52,000+ listings and transactions
52,000+ listings and transactions across 9 countries. Prices, demand and speed of sale are specific to the reuse market of each country.
Research behind itDoctoral research at EPFL
Developed in PhD research at the École polytechnique fédérale de Lausanne (EPFL).
Comparable scaleFrom component to portfolio
Transparent and on one scale, so components, buildings and portfolios can be compared like for like.
Honest by designNo score instead of a guess
Where data is too thin, REON shows no score instead of a guess.
RVI Terminal · preview

Market value of components for reuse, by type and material

Aggregated from 52,000+ listings and transactions in 9 countries.

Preview
Component typeMaterialTypical RVIPrice vs newDays to saleShare sold12-month trendListings
Double-leaf windowPVC78%40%25th to 75th: 28 to 55%3360%▲ 4%4,820
Double-leaf windowTimber74%48%25th to 75th: 34 to 60%3857%▲ 3%1,940
Single-leaf doorTimber71%35%25th to 75th: 24 to 48%2966%▲ 2%3,610
WashbasinCeramic58%25%25th to 75th: 15 to 38%4148%▼ 3%2,150
BrickClay47%45%25th to 75th: 30 to 60%5241%▲ 6%5,290

Illustrative figures, not REON data.

The full terminal, filtered by country, material, condition and year, comes with a demo.

Get a demo
Solutions

One method, four ways to use it

Institutional owners
Find what to keep, reuse or sell before scope and budget lock.
Developers
Specify components with known reuse value and plan for the value they keep at end of life.
Portfolio managers
Rank buildings on the same four criteria and send audit budget where it pays off.
Reuse experts
Start an audit or a deconstruction from a ranked component list, not a blank page.
How REON fits

REON scores. Experts deliver

REON works before the decision and hands the shortlist on to the experts who carry it out: reuse auditors, deconstruction firms and marketplaces.

Before the freeze · REON

Score and prioritise

A fast first read of every component, from data you already hold.

  • Ranked components, CHF and CO₂
  • Confidence flag on every result
  • A shortlist, ready to hand to experts and marketplaces
After the score · Expert partners

Audit, dismantle, resell

Experts take the shortlist and do the work on site.

  • Targeted audit of priority components
  • Deconstruction and reuse in your projects
  • Resale through specialised marketplaces

1 · REON scores→2 · The shortlist goes to experts and marketplaces→3 · Components go back into use

Compared

How REON differs from other approaches

WhoGap before the decisionWith REON
Reuse auditors and deconstruction expertsCalled in after scope is setA ranked shortlist, so their time goes where the value is
Component marketplacesStart after the decision to dismantleFinds the value earlier
ESG and LCA softwareCarbon onlyCHF, CO₂, technical fit and demand together
Urban-mining and material-stock studiesMass and material, not component valueComponent-level reuse value
ConsultantsKnowledge stays in the projectOne method and one market reference for every building
Proposed pilot

One building. Five days. A ranked result

We score one building from the data you already hold and walk through the result with your team.

1building
5 daysafter data check
Fixed pricequoted upfront, on request
1 reportranked, valued, exportable

After the pilot: a targeted audit, reuse, resale or more buildings. Optional BIM survey with BIM Facility.

Get a demo

Send an address and the data you hold. We prepare the demo or the pilot from it. We reply within two working days. Pilot pricing is shared on request.

See what you can reuse before the freeze